Overview
Cindopox E6-143 is the clear coat that goes over a flake floor. It is a two-pack epoxy at 99 percent solids, which means almost nothing evaporates out of it as it cures, so the film you pour on is close to the film you keep. It flows out level, buries the edges of the flake, and dries clear.
That thickness is the point. A thin clear coat over a flake floor leaves you feeling the chip edges underfoot. Cindopox is built at 200 microns per coat, so it fills between the flakes rather than draping over them, and Chemstuk rates it to 110 degrees Celsius in service.
Key Features
- Two-pack clear epoxy glaze at 99 percent solids
- Self levelling, so it flows out without roller marks
- Buries flake edges and dries crystal clear
- Rated to 110 degrees Celsius in service
- Resistant to chemicals, abrasion and heat
- VOC of 60 g per litre, with no flash point listed
Specifications
- Mix ratio: 2 parts A to 1 part B, by volume
- Pot life: 40 minutes at 25 degrees Celsius
- Solids by weight: 99 plus or minus 0.5 percent
- Build: 200 microns per coat
- Coverage: 5.3 square metres per litre, so roughly 64 square metres from a 12 L kit and 127 square metres from a 24 L kit, per coat
- Recoat: 8 to 72 hours at 25 degrees Celsius
- Foot traffic: 24 hours
- Full cure: 7 days
- Specific gravity: Part A 1.1 kg per litre, Part B 0.9 kg per litre
- Clean up: xylene
- Pack sizes: 6 L, 12 L and 24 L kits
Applications
- Glaze coat over epoxy flake systems
- Clear finish over tinted solid epoxy
- Polished and decorative concrete
- Sprinkle and glitter systems
- Garages, showrooms, workshops, retail floors and basements
Mixing And Working Time
Chemstuk’s instruction is to mix at low speed for three minutes and not to thin the product. Forty minutes of pot life at 25 degrees Celsius halves on a hot slab, and a full bucket of mixed solids epoxy generates its own heat, so mix in smaller batches and get the material onto the floor rather than leaving it standing.
What You Need to Complete the Job
Over bare concrete this is a glaze, not a primer, so prime the slab with Primit E6-111 first. Over a flake floor, scrape off any proud Color Chips and vacuum thoroughly before you glaze. If the floor gets wet or sits on a ramp, stir Grip-PE 711 into the final coat and back roll to keep the spread even. The full range is on the Chemstuk brand page.
Frequently Asked Questions
Is Cindopox UV stable?
No, and Chemstuk says so plainly. On a floor that gets direct sun through a roller door or a skylight, finish with an aliphatic polyurethane over the top so the glaze does not amber.
What happens if I miss the 72 hour recoat window?
Inside the window the coats bond chemically. Past it the surface has hardened off, so the floor has to be abraded back to a uniform matt and vacuumed before anything else goes on it.
How much does a 24 litre kit cover?
About 127 square metres per coat at 200 microns. Over a heavily flaked floor the first coat disappears into the chips, so budget for more than the theoretical figure.
What condition does the slab need to be in?
Chemstuk specifies concrete of at least 25 N per square millimetre, at least 28 days old, free of laitance and curing membranes, and dry to 75 percent relative humidity tested to ASTM F2170.




